Blast Booth Upgrade
(Design & Build)

Our team undertook a comprehensive overhaul of an engineering blast booth, providing general, electrical, and mechanical services throughout the project.
  • The scope included: Removing the existing blast booth.
  • Modifying concrete to accommodate a full-floor recovery system.
  • Constructing a full safety containment system for hazardous dust mitigation.
  • Installing a new blast booth and a high-capacity dust collection system rated for 40,000 lbs.
  • Implementing an ACTAV control system for precise mapping and tracking of cadmium and chrome dust particles.

This project highlights our ability to deliver state-of-the-art solutions that enhance operational safety, efficiency, and compliance with environmental standards.